Jirásek Theatre Reconstruction
The theatre has undergone a large-scale reconstruction, which not only changed the position of the main entrance, but also completely redesigned its internal layout. The new main entrance and the café on Panská Street have enlivened the historic centre, especially in the early evening. The high-quality public space in Jirásek Street and the practical pedestrian connection between Jirásek and Panská Street have raised the stature of this part of the town.
Estudio | |
---|---|
Autor | Adam Rujbr |
Website | |
Redes sociales | |
Equipo de diseño | Chief project engineer: Michal Surka Interior: Michaela Bastlová Architect, engineer: Aleš Chlád Architects: Monika Prostředníková, Kateřina Gayerová Author’s supervision: Klára Jansová |
Créditos fotográficos | BoysPlayNice |
Colaboradores | Construction project: Vlastimil Čegan Landscape project: Lucie Tlustá Realization: Metrostav |
Marcas | AGC Processing Teplice |
Inicia sesión para acceder y descargar contenidos
¿Aún no tienes una cuenta? Regístrate en LINKA y disfruta de nuestros servicios de comunicación en medios. Si eres un profesional de la arquitectura o el diseño de interiores, un promotor o contratista, o si trabajas en un medio de comunicación, podrás acceder a todas las funciones y beneficios ofrecidos por LINKA.