Jirásek Theatre Reconstruction
The theatre has undergone a large-scale reconstruction, which not only changed the position of the main entrance, but also completely redesigned its internal layout. The new main entrance and the café on Panská Street have enlivened the historic centre, especially in the early evening. The high-quality public space in Jirásek Street and the practical pedestrian connection between Jirásek and Panská Street have raised the stature of this part of the town.
Studio | |
---|---|
Author | Adam Rujbr |
Website | |
Social media | |
Design team | Chief project engineer: Michal Surka Interior: Michaela Bastlová Architect, engineer: Aleš Chlád Architects: Monika Prostředníková, Kateřina Gayerová Author’s supervision: Klára Jansová |
Photographer | BoysPlayNice |
Collaborator | Construction project: Vlastimil Čegan Landscape project: Lucie Tlustá Realization: Metrostav |
Featured brands | AGC Processing Teplice |
Log in to view and download full content
Do not have your account? Register to LINKA for media or architecture / architect, designer, investor, contractor / and get access to LINKA’s media services.