Aquapark Kyjov
The Aquapark Sport and Relaxation Center began with a modernization of the outdoor public swimming pool and now has a newly-built indoor swimming pool to complement it. The pool history started early in the 20th century with the establishment of the river swimming spa. The complex is sensitively set in the interface between the existing urban structure and central Kyjov park; it is surrounded by 100-year-old trees. Because of a new operating arrangement, the existing area receives maximum use. With close proximity to the park and city center, clients can discover an attractive sporting and relaxation experience.
Studio | |
---|---|
Author | Václav Navrátil, Jan Sedláček |
Website | |
Social media | |
Design team | Eva Pokorná, Patrik Obr, Markéta Raková, Eliška Brabcová, Jan Cihlář, Kateřina Zabadalová |
Photographer | BoysPlayNice |
Collaborators and suppliers | Building contractor: Consortium Metrostav and Metrostav DIZ Chief engineer: CENTROPROJEKT GROUP |
Featured brands | GipsCon HaSaM SENZOR BOHEMIA VALMAX Led Eco RI okna Saunas Salus Aquarena SANELA RAKO PREFA Lumideé DEKMETAL Berndorf Bäderbau Beleta ASSA ABLOY AGROB BUCHTAL |
Log in to view and download full content
Do not have your account? Register to LINKA for media or architecture / architect, designer, investor, contractor / and get access to LINKA’s media services.